Access and logistics
If the entrance is used by vans or larger vehicles, agree the loading and turning requirements before choosing the construction.
Why it matters for your resin driveway: Record the narrowest route, gate openings, storage space and any restrictions on delivery or unloading. For a resin driveway, it can affect preparation, base suitability, drainage, edging and the finished level under vehicle use.
Useful photograph: the route from the road to the work area and its narrowest point.
