Permissions and frontage
If a property has an older boundary wall or entrance piers, include their condition and the finished surface junctions in the quotation.
Why it matters for your tarmac surfacing: Confirm the property-specific position with the named authority before the design and price are finalised. For tarmac surfacing, it can affect excavation, compaction, course depths, drainage, edge support and the handover programme.
Useful photograph: the full frontage, boundary and connection to the highway.